Halal Industrial Park by PT Gerbang Teknologi Cikarang (subsidiary of Jababeka Group) supports thegrowth of Indonesia’s halal industry through collaboration with key stakeholders, including the Ministry ofIndustry, Halal Inspection Agency, The Halal Product Assurance Organizing Body, and NationalCommittee for Sharia Economics and Finance. Each stakeholders has an important role in the halalecosystem and is working together to advance the halal industry in Indonesia by integrating certification,standards, financial support and market information. Halal Industrial Park contributes significantly toadvance the export and import of halal products to the Middle East and Europe, in this way, the clusterhelps open new opportunities for business to reach international markets with reliable and quality halalproducts.
Investment Target
IDR 26,200,000,000
Project Status
Looking For Investors
SEZ Lido is located in Bogor Regency, West Java Province, and is accessible by both land and railway transportation. It is approximately 2 hours from Soekarno Hatta International Airport via toll road. The SEZ Lido was established under Government Regulation No. 69 of 2021 with its main activity in tourism, proposed by PT MNC Land Lido, which has strong experience in creative, entertainment, and tourism industries.Developed as a world-class destination, SEZ MNC Lido City will present MNC World Lido featuring MNC Park (the first international-standard theme park in Indonesia), retail, dining & entertainment facilities, luxury hotels & resorts, an 18-hole championship golf course designed by Ernie Els, exclusive villas, Movieland (the most integrated one-stop studios), and a Music & Arts Center as Indonesia’s first world-class outdoor music and arts festival venue.
Investment Target
IDR 33,400,000,000,000
Project Status
Looking For Investors
GWA Tampomas is established in 2013 based on preliminary survey conducted by Geological Agency (MEMR), with very adequate data and information from geological, geochemical, and geophysical surveys. Tampomas's potential is estimated at 32 MW with a reservoir temperature of 175 oC. The heat source of the geothermal system in the Mount Tampomas geothermal area is thought to have formed from partial melting of subduction that began in the Plio-Pleistocene. The geological structure of Gunung Tampomas is closely related to compression tectonics in the south of Java Island in subduction with relatively north-south and southwest-northeast main stress directions. This thrust direction forms the Sumedang Fault, which controls the emergence of geothermal manifestations on Gunung Tampomas
Investment Target
IDR 160,000,000,000
Project Status
Looking For Investors
GWA Galunggung is established in 2014 based on preliminary survey conducted by PT Energi Kinan Internasional, with very adequate data and information from geological, geochemical, and geophysical surveys. Galunggung's potential is estimated at 220 MW with a reservoir temperature of 225o C. The heat source of the geothermal system in the Galunggung prospect is Mt. Galunggung and possibly Mt. Kencana. The pattern of low resistivity anomalies in the south of Galunggung Crater, which is a clay rock resulting from hydrothermal alteration, has the potential to be the host rock for the geothermal system in Galunggung. The Galunggung prospect reservoir is estimated to be under and following the pattern of the host rock. Based on Montecarlo calculations, with a 50% probability, the total geothermal potential of Mt. Galunggung is 220 MW.
Investment Target
IDR 4,400,000,000,000
Project Status
Looking For Investors
Bogor City is launching a new tram system called TRAMPAKUAN to address transportation issues. The first phase, Line 1, will be a 8-kilometer loop with 18 stations connecting key landmarks. It features a single track section around the botanical gardens and presidential palace, transitioning to a double track towards the depot along the Jagorawi toll road. The line will integrate with the LRT Jabodebek, commuter bus, and railway stations. Ten trams are expected to carry over 17,000 passengers daily, reducing city transport traffic. The demand is projected to grow over 23,000 passengers by 2040. The 30-meter trams will have a capacity of over 200 passengers each and will be powered by overhead lines, except for a 900-meter section near the presidential palace where batteries will be used. A depot with additional space for future trams and a park & ride development is also planned.
Investment Target
IDR 1,690,000,000,000
Project Status
Looking For Investors
The Optimization of Water Supply System in Jatiluhur District, Purwakarta Regency project aims to improve the coverage and capacity of clean water services by revitalizing the intake system from Jatiluhur Dam, upgrading the water treatment plant, constructing a reservoir, and developing a 21.38 km pipeline network. The project will utilize water sources from the Ir. H. Djuanda Dam with a capacity of 200 liters per second to serve 9,518 house holds and 4 potential industries, including 2,810 units currently on the waiting list.
Investment Target
IDR 53,900,000,000
Project Status
Looking For Investors
Get in touch with us by filling out the form. Whether you expanding your business to West Java or buying goods from West Java, our team is ready to assist you every step of the way.