Bandung Regency's Downstream Network is an effort to accelerate the absorption of Phase 1 Bansel SPAM with the Bandung Regency service area. Downstream network construction is planned at 9,600 housing pipeline. Meanwhile, the capacity increased by adding network is 120 lps to reach full capacity. Based on external studies, the proposed business scheme is a join operation with a collaboration duration of 25 years.
Investment Target
IDR 48,000,000,000
Project Status
On Progress
The Karawang downstream network project is a project initiated to increase the absorption of the Jatiluhur Regional Cibeet SPAM WTP by adding a new SR (House Connection) in the Karawang Regency downstream network. High demand from society and industry, while limited water supply is the background for this project. Apart from that, there has been a change in PDAM Karawang's absorption plan so that the Company will optimize absorption by building a New Downstream Network. Currently, an MoU has been entered into with Perumdam Karawang and is in the FS (Feasibility Study) creation stage. The agreed service areas include Pangkalan, Tegal Waru, and Teluk Jambe Districts with a total of 60 lps.
Investment Target
IDR 30,000,000,000
Project Status
On Progress
The Optimization of Water Supply System in Jatiluhur District, Purwakarta Regency project aims to improve the coverage and capacity of clean water services by revitalizing the intake system from Jatiluhur Dam, upgrading the water treatment plant, constructing a reservoir, and developing a 21.38 km pipeline network. The project will utilize water sources from the Ir. H. Djuanda Dam with a capacity of 200 liters per second to serve 9,518 house holds and 4 potential industries, including 2,810 units currently on the waiting list.
Investment Target
IDR 53,900,000,000
Project Status
Looking For Investors
In facing the development of the Patimban Port Area and its surroundings in Subang Regencywhere the provision of clean water is needed to serve ship tenants, industrial estates anddevelopments in the area around Patimban Port. Regional Public Company Tirta RanggaSubang Regency as one of the BUMDs must be encouraged to provide clean water inPatimban.
Investment Target
IDR 134,200,000,000
Project Status
Looking For Investors
E-COMMERCE HUB OF INDONESIA is is one of the areas at the airport that is the centre of aviation logistics services equipped with warehousing and office facilities that are directly integrated with accessibility to the airport. With a total area of 68.4 hectares, this area is planned to be able to serve logistics movements with a capacity of up to 500,000 tonnes per year.
Investment Target
IDR 1,350,000,000,000
Project Status
Looking For Investors
MIXED USE COMMERCIAL AREA (MUCA) is an area that provides a variety of commercial facilities. Located in the middle of the airport area, this area consists of 3-Star, 5-Star Hotels, Parking Building, Convention Hall, Leisure Mall, Concourse, Train Station and Mosque which is directly integrated with the Terminal Building. With an area of ± 22.5 Ha, this area has a unique concept that is not owned by any Commercial Area within a radius of 150 Km from the Kertajati Airport Area..
Investment Target
IDR 1,540,000,000,000
Project Status
Looking For Investors
Get in touch with us by filling out the form. Whether you expanding your business to West Java or buying goods from West Java, our team is ready to assist you every step of the way.